GTH-C3 Hardware Getting Started Guides
Safety information, connector pinouts and a Declaration of R&TTE conformance. Every GTH-C3 system includes a hard copy of this document when delivered.
10-0013: E1/T1 Monitor 3.0 |
10-0014: SDH Monitor 3.0 |
10-0016: E1/T1 Messenger 3.0 |
GTH-C3 Hardware Certification and Regulatory Testing
GTH-C3 hardware has been tested by Intertek Testing (ETL-SEMKO).
These documents are available to our customers. If you want a password, contact matthias@corelatus.com.
Reports for GTH 3.0 and STH 3.0 hardware
Standard | Document |
---|---|
IEC 62368-1 | Test Report (2024) |
IEC 62368-1 | CB Certificate (2024) |
UL 62368-1/CSA C22.2 62368-1 | Recognized Component Report (2024) |
EN 300 386 | EMC Test Report (2011) GTH 3.0 STH 3.0 |
FCC Part 15 | EMC Test Report (2011) GTH 3.0 STH 3.0 |
Documents for superseded hardware
Test reports for GTH 2.1 systems. GTH 2.1 was superseded by GTH 3.0 in 2014.
Standard | Document |
---|---|
- | 10-0006: E1/T1 Messenger 2.1 Getting started |
IEC/EN 60950-1 | Test Report (2011) |
IEC/EN 60950-1 | CB Certificate (2013) |
ANSI/UL 60950-1 CAN/CSA-C22.2 No. 60950-1 | Recognised Component Report (2013) |
EN 300 386 | EMC Test Report (2006) |
FCC Part 68 | Test Report (2006) |
CS03 | ISDN Test Report (2006) |
Test reports for GTH 2.0 systems. GTH 2.0 was superseded by GTH 2.1 in 2008.
IEC/EN 60950-1 Test Report |
Recognized Component Report |
CB Certificate |
Safety information and pin-outs for GTH 1.x and IEB 1.0 systems.
GTH 1.x and IEB 1.0 systems were superseded by GTH 2.0 in 2006.
GTH 1.x/IEB 1.0 |
CB Certificate for GTH 1.x(2004) |
EMC Test Report for GTH 1.x |
EN 60950 Electrical Safety Test Report for GTH 1.x |
EN 60950 Verification of Conformity for GTH 1.x |